What comes first in an Ottawa kitchen renovation: permit, ESA or demolition?

Question

What comes first in an Ottawa kitchen renovation: permit, ESA or demolition?

Answer from Kitchen Reno IQ

The order the rules set out

The building permit comes before construction. The Building Code Act says "no person shall construct … unless a permit has been issued." That means if your job includes anything on the City's permit list, such as moving a wall, relocating the sink or extending the plumbing system, the permit is in hand before any demolition starts.

The ESA notification for electrical work is filed before the electrical work starts. The Electrical Safety Authority is clear on that timing: the person doing the electrical work, whether a homeowner or a Licensed Electrical Contractor, files the notification first, then does the work, then gets it reviewed as soon as it is complete.

If your kitchen has a gas range and the line needs to be moved or capped, a TSSA-certified gas technician working for a TSSA-registered contractor does that work. We found no rule that orders gas work against the building permit, and a gas line is not named on either City list, so ask the City before the work starts.

For an older home, Health Canada says to test for asbestos before any demolition or remodelling. If a professional finds asbestos, Health Canada says to hire a qualified asbestos removal specialist to remove it safely. Testing and removal are covered on ottawaabatement.com.

Putting it plainly:

  • asbestos test (older homes, before demolition)
  • building permit issued (where the job needs one, before construction)
  • ESA notification filed (before electrical work starts)
  • gas work by a TSSA certificate holder (ask the City about permit timing)
One thing worth knowing: not every kitchen job needs a permit. Replacing cabinets and countertops while the sink stays in place is on the City's exempt list. A like-for-like faucet or fixture swap is outside the plumbing permit line. If you are unsure whether your specific scope triggers a permit, ask the City's Building Code Services before the work starts.
Ottawa Kitchen Renos

Want this done at your place?

Tell us what you want to change in your kitchen and we'll send it to local Ottawa kitchen renovation contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.

Fields marked are required.

We won't call you. There's no phone box above because we don't ask for one — your estimate comes by email, on your time.

Request received We’ve sent your details to local Ottawa kitchen renovation contractors. Interested contractors reply by email. A confirmation is on its way to your inbox.

Kitchen Reno IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.

Ready to Get Quotes?

Find local kitchen renovation contractors in Ottawa. Free matching, no obligation.

Find a Kitchen Contractor