Free Kitchen Contractor Matching Permits, ESA & Published Prices Kitchens Across Ottawa
Find a Kitchen Contractor
Opening Kitchen Walls | 0 views |

Opening a kitchen wall in a 1950s Alta Vista bungalow: test first?

Question

Opening a kitchen wall in a 1950s Alta Vista bungalow: test first?

Answer from Kitchen Reno IQ

Health Canada says to hire a professional to test for asbestos before renovating or remodelling a home of that era, and to hire a qualified asbestos removal specialist if any is found. A 1950s bungalow is also old enough that Health Canada considers lead-based paint probable if the home was built before 1960. Health Canada frames both as advice to follow before renovating.

Older materials Health Canada lists include "cement and plaster" and "floor and ceiling tiles". Health Canada does not say which specific materials in your wall contain asbestos; a professional tests what is there. For lead, Health Canada's guidance is not to use sanders, heat guns or blowlamps to remove lead-based paint. Testing and removal procedures are ottawaabatement.com's topic.

On the permit side, the City of Ottawa lists "adding or removing walls, i.e., creating different room sizes and/or uses" as a building permit project. If the wall you are opening changes room sizes or uses, a permit is required before construction starts, under the Building Code Act. If the wall is load-bearing, the City may ask for engineered drawings; your designer or engineer confirms. A short partition that does not change room sizes is not named on either the City's permit or exempt list, so ask the City's Building Code Services before that work starts.

What to have in order before the first hammer swing

In an older home, the sequence the sources give is: test for asbestos before demolition, get the building permit issued before construction where one is needed, and file any ESA notification before electrical work starts. Ask your contractor for a written schedule that shows when each of those steps happens.

For the contract itself, the Consumer Protection Act, 2002 says a direct agreement negotiated at your home over $50 must be in writing, signed by both parties and delivered to you, and that the supplier shall not charge an amount that exceeds the estimate by more than 10 per cent. Make sure the written contract names the scope by component, the total price, the payment schedule and the project dates, and that it is in your hands before any work begins.

Before you commit to a price, ask the contractor to put in writing exactly which materials will be tested, who pulls the building permit, and what happens to the schedule and the price if the test results require abatement.

Ottawa Kitchen Renos

Want this done at your place?

Tell us what you want to change in your kitchen and we'll send it to local Ottawa kitchen renovation contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.

Fields marked are required.

We won't call you. There's no phone box above because we don't ask for one — your estimate comes by email, on your time.

Request received We’ve sent your details to local Ottawa kitchen renovation contractors. Interested contractors reply by email. A confirmation is on its way to your inbox.

Kitchen Reno IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.

Ready to Get Quotes?

Find local kitchen renovation contractors in Ottawa. Free matching, no obligation.

Find a Kitchen Contractor